communityfix.org

Contribute

The catalog gets stronger with every contribution. Close a flagged gap below, or add something the catalog is missing.

Issues & solutions (40)

Needs sources

#00180Bottled-water extraction competes with communal aquifers

Commercial bottling can dominate the same aquifer that supplies local taps. At Vittel, Nestle Waters accounts for roughly 80% of the deficit of an overdrawn aquifer, and illegal boreholes and treatments led to a 2 million euro settlement in 2024.

Vittel, Vosges, Franceregion
Needs location

#00208Large data-center load shifts grid and capacity costs onto households and other ratepayers

PJM's independent market monitor attributed 38% of the latest capacity auction cost to data-centers. Speculative interconnection requests inflate queues further, and where cost-allocation rules are unchanged the resulting charges spread across all customers.

national
Needs sources

#00174Water crises hit the poor hardest through tanker markets and unequal rationing

When piped supply fails, informal tanker markets and rationing shift the burden to low-income households, who pay the highest unit prices for the least water. Chennai's poor got about 30 litres per person per day in 2019 while tanker prices roughly tripled.

Needs location

#00209Backup generators and on-site turbines add air pollution to neighbourhoods that often already fail air quality standards

Backup diesel generators and on-site gas turbines concentrate NOx and fine particulates in host neighbourhoods, many of which already fail ozone standards. At one Memphis site, 35 turbines were installed against a permit issued for 15.

region
Needs location

#00176Small single-source communes run out of drinking water in drought

Villages supplied by one well or spring are the first to fail in drought. In summer 2022 more than 100 French communes had drinking water trucked in and over 1,000 took exceptional supply measures; some Pyrenées-Orientales villages later spent months on bottled water.

region
Needs location

#00183Create a funded municipal heat office with an annually updated heat action plan

Give one named municipal officer a budget line and operational control over heat: early-warning protocols, cooling and respite operations, and year-round mitigation, revised in an annual heat action plan. Funded offices cut deaths within years; unfunded plans and advisory posts d

city
Needs location

#00181Vulnerable-person registry with scripted phone check-ins during alerts, opt-out by default

A city registry of heat-vulnerable residents (isolated elderly, people with disabilities or chronic illness) paired with scripted phone check-ins by trained agents during heat alerts, escalating to in-person visits when calls go unanswered. Opt-out enrollment by default — opt-in

city
Needs location

#00197Communal water-governance institutions with fast, peer-run dispute resolution

User-run bodies (irrigator communities, water tribunals, village assemblies) allocate scarce water and resolve conflicts cheaply, quickly, and by peers. Commons survive when boundary rules are clear and enforcement costs stay near zero — institutional design, not technology.

region
Needs location

#00202Cloud seeding to enhance precipitation (unproven at decision-relevant scale)

Silver-iodide or hygroscopic seeding of clouds to increase rain or snow. Politically attractive, but the US GAO found estimated effects often statistically indistinguishable from zero, and no drought-scale water yield has been demonstrated anywhere.

region
Needs location

#00203Long-distance and fossil-aquifer water transfer megaprojects

Pump water hundreds of kilometres or mine non-renewable aquifers to supply cities. A high-risk approach: systemic risk concentrates in a single artery, and fossil-aquifer mining is non-renewable by definition — making both patterns cautionary as much as options.

national
Needs location

#00182Transparent emergency demand management: dashboards, escalating tariffs, pressure management and a communicated deadline

Cut urban water demand fast during a supply crisis by combining real-time public dashboards, escalating restriction levels and block tariffs, network pressure management, flow restrictors, and a communicated deadline—with the burden visible and uniform across the city.

city
Needs location

#00184Wire heat alerts to a hotline run by a trusted aging nonprofit, with nurse triage and home visits

Locally calibrated heat alerts that trigger a delivery chain, not just a broadcast: a hotline staffed by a trusted aging-services nonprofit, nurse triage, field home visits, homeless outreach, and neighbor buddy systems, so vulnerable people are found and helped during each alert

city
Needs location

#00216Retrofit operating cooling plant with attenuators, enclosures and low-tonality fans

Fit fan mufflers, acoustic shrouds, inlet and exhaust enclosures and lower-speed fans to plant already causing complaints. Documented at CyrusOne in Chandler, Vantage in Sterling, Amazon in Northern Virginia and Microsoft's Mount Pleasant site. No operator publishes the cost.

neighborhood
Needs sources

#00173Cities in drying climates face recurring Day Zero drinking-water shortfalls

Major cities from Cape Town to Chennai have come within weeks of running dry as droughts lengthen and demand grows. Emergency rationing, tanker dependence, and lost public trust follow, exposing how unprepared urban supply systems are for a drier climate.

Needs location

#00185Potable reuse of treated wastewater behind multi-barrier treatment and long acceptance-building

Purify treated wastewater through an advanced multi-barrier train (ultrafiltration, RO, UV/AOP) and return it to drinking supply via aquifer recharge, reservoir blending, or direct injection. Proven since Windhoek's 1968 launch; the binding constraint is public acceptance, not en

city
Needs location

#00192Distribute cooling units to at-risk households through community organizations

Free portable heat-pump or AC units for low-income, high-risk residents (60 and over, medical conditions, living alone), distributed through trusted community organizations that identify recipients, deliver, install and educate, rather than by the city directly.

city
Needs location

#00196Large-scale desalination sized as drought insurance

Seawater reverse osmosis gives cities a rainfall-independent supply. It works when sized against permanent aridification and framed honestly as insurance with flexible operating triggers; it fails financially through drought-panic procurement and rigid take-or-pay contracts.

region
Needs location

#00200Subsidized household rainwater harvesting for water-poor neighborhoods

City-subsidized roof-harvesting kits (first-flush separator, cistern, filters) designed for informal housing and installed with NGO and local-installer training, supplying 5-8 months per year of non-potable and filtered water in suitable climates.

city
Needs location

#00186Interconnect small networks, cut leaks and secure backup sources before crisis

Physically link neighboring communal water networks, repair leaking rural pipes, and pre-identify backup sources so no small commune depends on a single vulnerable well or spring. In France, financed via agences de l'eau and départements, typically carried by intercommunal syndic

region
Needs location

#00187Door-to-door heat outreach through existing community health workers

Piggyback heat protection on trusted community health worker cadres who already go door-to-door in informal settlements: pre-alert awareness visits, symptom spotting and first response during heatwaves, reaching households that no cooling center or broadcast will.

city
Needs location

#00188Permanent structural demand reduction: turf removal, pricing, rebates and water-culture programs

Retire urban water demand permanently by running demand management as a standing institution with paid turf removal, tiered pricing, appliance and landscape codes, school and business programs, and continuous leak control. Las Vegas cut per-capita use 58% while adding 876,000 res

region
Needs location

#00194Statutory heat rules for outdoor work: WBGT stop-work thresholds, midday bans and funded inspections

National, enforceable heat rules for outdoor work: rest, shade, water and scheduling duties anchored on wet-bulb globe temperature stop-work thresholds rather than clock hours alone, backed by funded inspection capacity. Time-of-day bans by themselves miss dangerous humid days.

national
Needs location

#00189Designate a free climate-shelter network in existing public buildings

Designate libraries, schools, museums, civic centers, and pharmacies as a free climate-shelter network kept at or below 26 C, with standards for open access, seating, and drinking water. Coverage grows cheaply by repurposing existing buildings, but impact depends on public awaren

city
Needs location

#00190Run water as a public utility with a reinvestment mandate and a standing leak-reduction program

Reform water governance so operating margins are locked into a reinvestment mandate—pipe renewal, leak detection, and repair—rather than extracted as profit or dispersed by weak management. A public regie has a structural advantage in drying climates: it is not penalized by selli

city
Needs location

#00193Revive traditional rainwater-harvesting and recharge structures through village labor and ownership

Villages build and own earthen johads, contour trenches, sand dams, infiltration canals and ponds with NGO facilitation. Cheap per structure and compounding at catchment scale, but success hinges on hydrogeological siting, maintenance institutions and demand rules.

region
Needs sources

#00175Day Zero by decay: leakage and underinvestment collapse urban supply without drought

Some cities run dry not from drought but from decades of underinvestment. Johannesburg loses ~45% of its water to leaks and illegal connections and endures rolling outages even when reservoirs hold water; Mexico City loses ~40%.

Needs location

#00195National household-cistern program delivered by community networks

A standardized 16,000 litre roof-catchment cistern per family, built by locally trained masons with family labor and delivered through a civil-society network with federal funding. Covers drinking and cooking water through an 8-month dry season.

national
Needs sourcesNeeds location

#00179Irrigation water storage pits farmers against communities over shrinking groundwater

As aquifers shrink, storing winter water for summer irrigation splits territories: a minority of irrigating farms gain security while other users and ecosystems fear capture of a common resource. In France the conflict has escalated to court battles and violent protest.

region
Needs location

#00199Stormwater capture and managed aquifer recharge funded by a dedicated impermeability levy

Turn flood-control drainage into water supply with spreading grounds, injection wells and green infrastructure that recharge aquifers, financed by a hypothecated parcel tax on impermeable area so revenue scales with the pavement causing the runoff.

region
Needs location

#00198Winter-filled substitution reservoirs with agroecological conditions (contested)

Pump shallow groundwater in winter into lined open reservoirs so farms substitute stored water for summer abstraction, tied by protocol to agroecological commitments. Contested: supporters cite modelling and court validation; opponents cite evaporation, resource capture, and mala

region
Needs location

#00201National water-sobriety plan: withdrawal-reduction targets, reuse rollout and leak funding per basin

A national framework that sets basin-level withdrawal-reduction targets, funds leak repair, unblocks wastewater-reuse permitting and pushes progressive pricing. Delivery depends on municipal-scale mechanisms and sustained funding, not on the announcement itself.

national
Needs location

#00221Offer faster interconnection in exchange for contractually curtailable load

Connect large loads sooner if they accept curtailment during scarcity hours. Modelling finds 76 to 126 GW of headroom in the 22 largest US balancing authorities at 0.25–1% of hours curtailed. Google has signed 1 GW of demand response but publishes no curtailment performance data.

national
Needs location

#00220Create a large-load tariff class with minimum take, long contract term and exit fees

Put customers above roughly 25 MW in their own rate class, obliged to pay for 85% of contracted capacity for 12–14 years with collateral and exit fees. After Ohio approved one, the utility's large-load forecast fell by half, revealing much of the queue as speculative.

national
Needs location

#00223Mandate per-facility energy and water reporting with a penalty attached, and bar NDAs covering utility impacts

Require each facility above a size threshold to report metered energy, water withdrawal and consumption to a public register, with a real penalty for non-reporting, and prohibit local NDAs that cover utility impacts. The EU tried this without penalties and got 36% participation.

national
Needs location

#00224Negotiate community benefit agreements with numeric, measurable and independently enforceable thresholds

Where a community has rezoning leverage, convert it into a binding agreement with numeric terms: decibel limits at named receptor addresses, an annual water cap, disclosed load, local hire percentages with a definition of local, and payments — all with funded, non-judicial enforc

city
Needs location

#00215Write noise limits in octave bands and dBC, measured at the residential property line, as a permit condition

Replace single-number dB(A) ordinances with limits that also constrain C-weighted and per-octave-band levels at the nearest residence, set as a permit condition rather than a complaint threshold. Prince William County proposed exactly this after observing a 90 Hz tone at a specif

city
Needs location

#00222Require Tier 4 emission standards, metered runtime and permit-before-operate enforcement for on-site combustion

Set a Tier 4 baseline for new generators, meter and publish runtime hours, define emergency narrowly so scheduled outages do not qualify, and enforce permits before equipment operates. Virginia adopted a 0.60 g/hp-hr baseline from July 2026.

region
Needs location

#00219Make reclaimed or non-potable water the default permitted supply for cooling

Condition data-centre cooling permits on treated municipal effluent, brackish groundwater, or industrial process water by default, with potable connection allowed only by explicit exception. Microsoft's San Antonio site reports 79% of consumption from recycled or non-potable sour

city
Needs location

#00225Sell waste heat into a district heating network at a market price rather than donating it

Connect the facility's cooling loop to a district heating network under a contract that pays per MWh delivered at a market-referenced price. Stockholm's open market has ~20 suppliers; Odense delivers 215,000 MWh/year to over 12,000 homes using ammonia heat pumps.

city
Needs location

#00217Run a measured cohort study of sleep and cardiovascular outcomes in populations adjacent to operating data-centers

Pair octave-band exposure monitoring at homes with sleep actigraphy, ambulatory blood pressure, and health-record endpoints, using distance and buildout timing for identification. Several US and Irish clusters have a decade of operation next to stable populations.

region

Case studies (50)

Needs cost

PhagoBurn consortium and participating European burn centres · Region

PhagoBurn was a randomized, controlled phase 1/2 trial comparing a topical anti-Pseudomonas aeruginosa phage cocktail with standard care for infected burn wounds, conducted across multiple European burn units. Manufactu…

Median time to sustained reduction in bacterial burden47 hours with standard care144 hours with phage treatmenthours
Analysable participants with maximal bacterial burden2 of 13 with standard care6 of 12 with phage treatmentparticipants

2 sources

Arnaud Gissinger
Needs baselineNeeds cost

NHS England and the National Institute for Health and Care Excellence · National

NHS England and NICE piloted fixed annual payments for access to cefiderocol and ceftazidime-avibactam, with value assessment designed to recognize preparedness and public-health benefits rather than prescription volume…

Antimicrobial products in the initial pilot2products

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Denmark

Success

Statens Serum Institut, Technical University of Denmark and Danish authorities · National

Denmark established DANMAP in 1995 to monitor antimicrobial consumption and resistance across humans, food animals and food. Clinical laboratories, veterinary authorities and national health data contribute to annual in…

3 sources

Arnaud Gissinger
Needs evidenceNeeds cost

ARA Neugut wastewater treatment plant and Swiss research partners · City

The Neugut wastewater treatment plant near Zurich was Switzerland's first full-scale municipal ozonation installation. Researchers sampled effluent at three stages — conventional treatment, ozone treatment, and biologic…

1 source

Arnaud Gissinger
Needs evidenceNeeds cost

India

Failed

India Ministry of Environment, Forest and Climate Change and Central Pollution Control Board · National

In January 2020, India published draft environmental rules proposing concentration limits for residues of 121 antibiotics in treated effluent from bulk-drug and formulation facilities — a proposal that would have create…

2 sources

Arnaud Gissinger
Needs cost

Dutch government, Netherlands Veterinary Medicines Institute, veterinarians and livestock sectors · National

Beginning in 2009, the Netherlands combined national reduction targets with farm-level and veterinarian benchmarking, restrictions on critically important antibiotics, mandatory treatment plans and sector-specific anima…

Veterinary antibiotic sales2009 reference levelAlmost 70 percent lower in 2019relative change

3 sources

Arnaud Gissinger
Needs evidenceNeeds cost

China

Success

Government of China, veterinary authorities and food-animal producers · National

China banned colistin as a growth-promoting feed additive in 2017 after plasmid-mediated mcr-1 resistance was identified in animals, food and people. Researchers compared colistin use, resistant Escherichia coli and mcr…

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Denmark

Partial

Danish government, livestock sectors and DANMAP partners · National

Denmark progressively ended antimicrobial growth promotion, beginning with specific products and followed by voluntary and regulatory withdrawal across major pig and poultry production. DANMAP (Danish Integrated Antimic…

2 sources

Arnaud Gissinger
Needs baselineNeeds cost

Region

The WASH Benefits cluster-randomized trial evaluated household water, sanitation, handwashing, and nutrition interventions among young children in rural Bangladesh. A secondary analysis examined caregiver-reported antib…

Children using antibiotics at least once10 to 14 percent lower in intervention groupsrelative prevalence
Children using antibiotics multiple times24 to 35 percent lower in intervention groupsrelative prevalence

1 source

Arnaud Gissinger
Needs baselineNeeds cost

United States immunization programmes, healthcare providers and public-health agencies · National

The United States introduced pneumococcal conjugate vaccination (PCV7, later expanded to PCV13) for children in 2000. Vaccination reduced invasive pneumococcal disease caused by vaccine serotypes — many of which were an…

Vaccine-serotype invasive pneumococcal disease in children90 percent decreasechange since vaccine introduction (2000)
Vaccine-serotype invasive pneumococcal disease in adults (indirect/herd protection)60 percent decreasechange since vaccine introduction (2000)

2 sources

Arnaud Gissinger
Needs cost

Israel

Success

Israel Ministry of Health and participating healthcare facilities · National

A clonal outbreak of carbapenem-resistant Klebsiella pneumoniae spread across Israeli hospitals during 2006 and was not controlled by local measures. In 2007 the Ministry of Health mandated physical separation of carrie…

Monthly incidence of new CRE cases55.5 at intervention start11.7 by May 2008cases per 100,000 patient-days

2 sources

Arnaud Gissinger
Needs baselineNeeds cost

Sixteen general practices and University of Bristol research partners · Region

A randomized trial across 16 general practices in southwest England tested whether rapid multiplex microbiological point-of-care testing would reduce same-day antibiotic prescribing for children and adults with respirat…

Trial participants552patients
General practices enrolled16practices

1 source

Arnaud Gissinger
Needs evidenceNeeds cost

Vietnam

Partial

Vietnamese community health centres and research partners · National

Forty-eight community health centres in Vietnam were randomized to routine care or routine care with point-of-care C-reactive protein (CRP) testing for patients with non-severe acute respiratory infections. Testing was…

2 sources

Arnaud Gissinger
Needs cost

Finland

Success

Finnish public-health authorities and clinical professional bodies · National

After macrolide resistance in group A streptococci rose in Finland, national recommendations were issued by public-health authorities and clinical professional bodies to reduce macrolide use for respiratory and skin inf…

Macrolide consumption2.40 in 19911.38 in 1992defined daily doses per 1,000 inhabitants per day
Erythromycin-resistant group A streptococci16.5 in 19928.6 in 1996percent of isolates

1 source

Arnaud Gissinger
Needs cost

Sweden

Success

Swedish strategic programme against antibiotic resistance (Strama) · National

Sweden established Strama in 1995 as a national and regional collaboration for rational antibiotic use. Regional groups combine local treatment recommendations, surveillance, professional education, prescribing feedback…

Outpatient antibiotic prescriptions560 in 1992256 in 2025prescriptions per 1,000 inhabitants per year
Antibiotic prescriptions for children aged 0 to 41,328 in 1992349 in 2016prescriptions per 1,000 children per year

3 sources

Arnaud Gissinger
Needs baselineNeeds cost

U.S. Fish and Wildlife Service and Red Wolf SAFE partners · Region

The U.S. Fish and Wildlife Service began releasing captive-bred red wolves at Alligator River National Wildlife Refuge in 1987. More than 60 adults were released from 1987 to 1994, wild breeding followed and the populat…

Adult red wolves released from 1987 to 1994more than 60individuals
Peak wild population reported in 2012about 120individuals

3 sources

Arnaud Gissinger
Needs baselineNeeds cost

Michoacán University of Mexico, Goodeid Working Group, Re:wild and local partners · since 2022 · Region

Conservation breeders produced golden skiffia and prepared fish through pond and semi-natural mesocosm stages before release to the species' native Teuchitlán River. More than 1,000 fish were released in November 2022 w…

Golden skiffia released in November 20221000+individuals

3 sources

Arnaud Gissinger
Needs baselineNeeds cost

Sihek Recovery Program, U.S. Fish and Wildlife Service, The Nature Conservancy and zoological partners · since 2024 · Region

Nine captive-bred sihek (Guam kingfisher) arrived at predator-free Palmyra Atoll in September 2024 for a conservation introduction. Six were initially released after an acclimation period; subsequent monitoring confirme…

Birds transferred to Palmyra Atoll9individuals
Birds initially released in September 20246individuals

3 sources

Arnaud Gissinger
Needs baselineNeeds cost

Chester Zoo within the international Socorro dove breeding program · City

Chester Zoo maintains and breeds Socorro doves as part of an international coordinated program after the species became extinct in the wild. Eight chicks hatched at the zoo in 2025, adding genetically managed birds to t…

Socorro dove chicks hatched at Chester Zoo in 20258individuals

2 sources

Arnaud Gissinger
Needs baseline

Government of Mexico with fishing communities and conservation partners · Region

PACE-Vaquita sought to eliminate vaquita bycatch by enforcing gillnet restrictions, withdrawing fishing effort, testing alternative gear and compensating fishers. The IUCN Cetacean Specialist Group reports that 230 arti…

Artisanal boats withdrawn from fishing230boats
Artisanal boats participating in gear replacement105boats

$26M · Government of Mexico conservation expenditure reported before 2015 · 3 sources

Arnaud Gissinger
Needs baselineNeeds cost

Ninh Bình Forest Protection Department, community rangers, Endangered Primate Rescue Center and Fauna & Flora partners · Region

Van Long Nature Reserve protects the largest known population of Delacour's langur through reserve management coordinated between the Ninh Bình Forest Protection Department, community-led patrol teams (including former…

Estimated Delacour's langurs in Van Long Nature Reserve120individuals

3 sources

Arnaud Gissinger
Needs cost

New Zealand Department of Conservation Kākāpō Recovery Programme, Ngāi Tahu and partners · Region

The Kākāpō Recovery Programme moved the remaining birds to predator-free islands and manages breeding, genetics, health, nests and habitat intensively. New Zealand sources report that the known population increased from…

Known population51 in 1995236 in February 2026individuals

3 sources

Arnaud Gissinger
Needs cost

Antiguan Racer Conservation Project and local and international partners · Region

Invasive rats were eradicated from Great Bird Island and additional offshore islands, after which Antiguan racers were translocated to establish populations on restored sites. The species had been reduced to an estimate…

Estimated population before recovery work51Doubled within two years of rat removalindividuals
Additional offshore islands receiving reintroductions3islands

3 sources

Arnaud Gissinger
Needs baselineNeeds cost

South Africa Tortoise Conservation Trust, Turtle Conservancy and Rainforest Trust · Region

The partners established the Geometric Tortoise Preserve in 2015 to secure a large remaining population and its renosterveld habitat. Rainforest Trust reports that the preserve now covers 898 acres and was created to sa…

Habitat reported protected898acres
Share of species population the preserve was created to safeguard80percent

2 sources

Arnaud Gissinger
Needs baselineNeeds cost

EUMETSAT Satellite Application Facility on Land Surface Analysis · since 2025 · Region

The Meteosat Third Generation (MTG) Fire Radiative Power (FRP) product delivers active-fire observations over Europe and Africa at 1 km spatial resolution with 10-minute observation frequency and ~20-minute delivery lat…

Spatial resolution1km
Observation frequency10minutes

2 sources

Arnaud Gissinger
Needs cost

PROBOTEK and Huawei partners · since 2022 · Neighborhood

A pilot in Syngrou Forest combined 5G connectivity, ground sensors, drones and AI for early wildfire warning. Publicly available evidence is largely implementer-reported and does not establish changed dispatch or contai…

1 source

Arnaud Gissinger
Needs cost

XPRIZE Wildfire finalist teams with the University of Alaska Fairbanks · since 2026 · Region

XPRIZE finalists field-tested autonomous end-to-end systems in rural Alaska (Nenana) to detect, locate, and suppress test ignitions without human intervention, in partnership with the University of Alaska Fairbanks. The…

1 source

Arnaud Gissinger
Needs evidenceNeeds cost

Maui County and Hawaii emergency-management agencies · since 2023 · City

During the 2023 Lahaina fire, the emergency alert system failed to deliver timely, redundant warnings under extreme wind-driven conditions. Outdoor warning sirens were not activated; power and telecommunications outages…

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Australian building regulators, states and local authorities · National

Australia applies bushfire construction requirements under AS 3959 to new buildings in designated bushfire-prone areas. The standard sets construction requirements based on a Bushfire Attack Level (BAL) rating assigned…

1 source

Arnaud Gissinger
Needs evidenceNeeds cost

Australian state land and fire-management agencies · Region

Hazard-reduction burning is conducted in southern Australian forests by state land and fire-management agencies to reduce fuels and improve suppression opportunities. Effectiveness is constrained by extreme weather cond…

2 sources

Arnaud Gissinger
Needs baselineNeeds cost

Indigenous ranger groups and carbon businesses under Australian savanna fire methods · Region

Indigenous ranger groups apply carefully timed early dry-season burning across northern Australia to reduce large, high-intensity late-season fires. Projects generate verified carbon credits (ACCUs) under the Australian…

Current project area34.9million hectares
Indigenous-led emissions abatement since 201211.1million tonnes CO2-e

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Australian state, territory and Commonwealth emergency services with international assistance · since 2019 · Region

During the 2019–2020 Black Summer fires, Australian state, territory and Commonwealth emergency services activated cross-jurisdictional and international mutual aid. Despite pre-existing arrangements, the simultaneous,…

1 source

Arnaud Gissinger
Needs evidenceNeeds cost

South African conservation agencies and land managers · Region

Fynbos conservation practice shifted from broad fire exclusion toward active ecological fire management, including prescribed burning at locally appropriate intervals. Constrained burn windows, invasive plant encroachme…

2 sources

Arnaud Gissinger
Needs cost

South African Department of Forestry, Fisheries and the Environment through Working on Fire · National

Working on Fire combines public employment, trained wildfire crews, preparedness and integrated fire-management services across South Africa. The program is long-running and operational, but national fire outcomes depen…

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Ukuvuka Operation Firestop partnership · Region

Ukuvuka Operation Firestop was a multi-year partnership established after severe Cape Peninsula fires to integrate invasive alien vegetation control, fire management, and community coordination across the landscape. It…

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Indonesian Peatland Restoration Agency and successor institutions with regional partners · National

Following the 2015 peat-fire crisis, Indonesia established a dedicated Peatland Restoration Agency to implement canal blocking, rewetting, and community-based restoration across priority peatland regions. Implementation…

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Riau peatland communities with government and research partners · Region

In Riau Province, community peatland patrol and water-monitoring programmes have been implemented with government and research partners. Effectiveness depends heavily on whether hydrological management, land tenure clar…

1 source

Arnaud Gissinger
Needs evidenceNeeds cost

Indonesia

Failed

Indonesian land, peat and fire-management institutions before and during the 2015 crisis · since 2015 · National

During and before the 2015 fire crisis, drainage of peatlands remained widespread across Indonesia. Hydrological restoration was not implemented at the landscape scale required to prevent persistent smoldering peat fire…

1 source

Arnaud Gissinger
Needs cost

Federal University of Minas Gerais partners and participating conservation units · Region

A near-real-time web system combines satellite hot pixels, fuel condition, and simulation to predict fire spread across the Cerrado, with higher-resolution use in participating conservation units. Independent evidence o…

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Brazilian environmental agencies using INPE monitoring systems · Region

Brazil's DETER near-real-time satellite alert system (operated by INPE) targets environmental enforcement in the Amazon by routing alerts to field enforcement teams who conduct inspections, impose fines, issue embargoes…

2 sources

Arnaud Gissinger
Needs cost

Brazil

Ongoing

Government of Brazil with states, municipalities, civil society and traditional communities · since 2024 · National

Brazil enacted Law 14,944 on 2024-07-31 to establish a National Integrated Fire Management Policy. The law formally recognises ecological and traditional fire use, prevention, response, recovery, shared governance acros…

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Forest owners and Chilean fire-management authorities · since 2017 · Region

During the January 2017 Chilean megafires, plantation and mixed landscapes in central and south-central Chile burned at a scale that existing edge treatments, fuel breaks, and fire-response arrangements could not contai…

1 source

Arnaud Gissinger
Needs evidenceNeeds cost

Chile's National Disaster Prevention and Response Service (SENAPRED) and local authorities · since 2024 · Region

Chile's SAE emergency alert system issued evacuation messages during the February 2024 Valparaíso fires, but high loss of life prompted the government to commission an external investigation into whether the system prov…

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Canadian and United States air-quality and public-health agencies · since 2023 · Region

During Canada's 2023 wildfire season, Canadian and U.S. air-quality and public-health agencies coordinated monitoring, forecasts, and health messaging across the border as smoke plumes crossed jurisdictions. The respons…

2 sources

Arnaud Gissinger
Needs cost

Canada

Ongoing

Indigenous communities with Parks Canada and Natural Resources Canada partners · National

Indigenous-led cultural burning initiatives in Canada operate through partnerships with Parks Canada and Natural Resources Canada. Governance and land access barriers remain active challenges; programs are context-speci…

2 sources

Arnaud Gissinger
Needs sourcesNeeds cost

Canada

Ongoing

FireSmart Canada and participating communities · National

FireSmart Canada provides a national framework covering community, neighborhood, parcel, and building-level wildfire resilience measures. Implementation is delivered locally by participating communities and varies by pr…

Needs cost

California Governor's Office of Emergency Services and CAL FIRE · Region

California's Wildfire Mitigation Program, administered by the California Governor's Office of Emergency Services and CAL FIRE, funds community-scale home hardening and defensible-space work with a focus on socially vuln…

2 sources

Arnaud Gissinger
Needs evidenceNeeds cost

Butte County and local emergency authorities · since 2018 · City

The Camp Fire (November 8, 2018) triggered a mass evacuation of Paradise, Concow, and Magalia through a limited road network while wind-driven fire and long-range spotting rapidly overtook the area. The evacuation syste…

1 source

Arnaud Gissinger
Needs cost

Ramats de Foc network with shepherds and fire-management partners · Region

Ramats de Foc connects livestock grazing with strategically selected vegetation management and markets products associated with fire prevention, operating as an ongoing network in Catalonia rather than a completed proje…

1 source

Arnaud Gissinger
Needs evidenceNeeds sourcesNeeds cost

GRAF, Fire and Forestry Actions Support Group of the Catalan Fire Service · Region

Catalonia's GRAF (Fire and Forestry Actions Support Group) integrates specialist fire-behaviour analysis, strategic decision-making, and field operations within the Catalan Fire Service. The unit is embedded in the inci…

More ways to help


communityfix.org