Issues, solutions, and case studies for pay-for-performance-water-service
Found 6 nodes with this tag: 0 issues · 2 solutions · 4 case studies
Reform water governance so operating margins are locked into a reinvestment mandate—pipe renewal, leak detection, and repair—rather than extracted as profit or dispersed by weak management. A public regie has a structural advantage in drying climates: it is not penalized by selli
Replace volunteer committees with a professional maintenance company on a performance contract: hotline, guaranteed repair times (~3 days), preventive maintenance, and a stocked parts supply chain — funded by pooled mobile-money subscriptions and results-based payments tied to up
SEMAPA (municipal utility) with citizen board seats; self-built water committees in Zona Sur · since 2000 · City
Cochabamba is a critical cautionary case: in 2000 the 'water war' expelled the Bechtel-led concession after tariff hikes, and SEMAPA returned to public control with citizen seats on its board. Fifteen or more years late…
Municipal utility revenues; community self-funding for Zona Sur water committees · 1 source
Eau de Paris (municipal regie), City of Paris · since 2010 · City
On 1 January 2010 the City of Paris replaced its Veolia and Suez water distribution contracts with a single municipal regie, Eau de Paris. The regie cut prices 8% in 2010–11, invested 560 million EUR in the network and…
Water tariff revenues retained within the public regie · 1 source
PlayPumps International (Trevor Field); installs executed via NGOs including Save the Children · 2000–2009 · Region
PlayPumps International installed merry-go-round handpumps intended to lift groundwater as children played, with maintenance funded by advertising revenue on storage-tank billboards. Backed by approximately $60M from th…
Case Foundation, PEPFAR, USAID, Clinton Global Initiative (~$60M campaign) · 2 sources
FundiFix Ltd / Water Services Maintenance Trust Fund, with Oxford REACH, University of Nairobi and UNICEF · since 2013 · Region
A professional maintenance company on performance contracts replaced volunteer community management across two Kenyan counties. Communities call a hotline; "smart handpump" sensors (accelerometer + GSM) flag failures re…
Pooled user subscriptions via M-PESA plus results-based donor funding (FCDO/UKRI; share GmbH 1:1 bottled-water match) · 2 sources