Case study of

#00185 Potable reuse of treated wastewater behind multi-barrier treatment and long acceptance-building

Implementer

City of San Diego Public Utilities (Pure Water San Diego)

Timeline

Since Jan 1, 1999

Location

San Diego, California, USA32.7200, -117.1600

Description

San Diego's 1990s water repurification project was killed in 1999 by 'toilet to tap' talk-radio framing after failing to secure public acceptance. From ~2011, the city rebuilt the case using a demonstration facility, thousands of public tours, and patient coalition-building. Pure Water San Diego Phase 1 (30 MGD) is now under construction with ~$1.7bn total cost, including a $614M federal WIFIA loan, with completion expected ~2027-28 and a target of ~50% of city supply from purified water by 2035.

Metrics

3
Public support for potable reuse~26%>70%% support
Phase 1 capacity under construction30MGD
Federal WIFIA loan614million USD

Funding

$1,700,000,000 · City funds plus federal WIFIA loan ($614M) within a ~$1.7bn+ Phase 1

Lessons learned

  • A hostile media frame ('toilet to tap') can kill a technically sound project for a decade — pre-empting that framing before launch is a prerequisite, not an afterthought.
  • Recovery required a physical demonstration facility plus thousands of public tours; this moved measured support from ~26% to over 70% over roughly a decade.
  • The cost of the 1999 failure is measured in lost decades: first water is now expected ~2027-28, nearly 30 years after the original project was cancelled.

Documented Jul 24, 2026