Perth, Western Australia, Australia

#00195

SuccessRegion

Case study of

#00185 Potable reuse of treated wastewater behind multi-barrier treatment and long acceptance-building

Implementer

Water Corporation of Western Australia

Timeline

Since Jan 1, 2017

Location

Perth, Western Australia, Australia-31.9559, 115.8606

Description

Perth's Groundwater Replenishment Scheme at Beenyup recharges advanced-treated wastewater into deep aquifers for later drinking-water abstraction, the Southern Hemisphere's first such scheme. Capacity was doubled to 28 GL/yr in 2022 (stage 2 cost about A$262-320M). Approval was preceded by a 3-year trial, a visitor center and more than 2,500 public tours, which produced roughly 70% public support, and no referendum was held. The scheme is one pillar of a rainfall-independent supply portfolio built in response to permanent drying: streamflow into Perth's dams has fallen about 80% versus pre-1975 levels.

Metrics

4
Aquifer recharge capacity28 GL/yr after 2022 doublingGL/yr
Public support after trial and tours~70%% support
Public tours during acceptance-building>2,500tours
Streamflow decline driving the strategyPre-1975 streamflow~-80%% change

Funding

Water Corporation / WA state; stage 2 expansion ~A$262-320M

Lessons learned

  • A 3-year visible trial with mass public tours built roughly 70% support and made a referendum unnecessary.
  • Framing reuse as part of a rainfall-independent portfolio against permanent drying, not as a drought stopgap, anchored long-term commitment.
  • Deep-aquifer recharge provided the environmental buffer that eased both regulation and public comfort.

Documented Jul 24, 2026