Description

Platform screen doors installed across the Hong Kong MTR were associated with a 59.9% reduction in railway suicides, with no evidence of substitution to unsealed platforms. The lower reduction compared to other cities partly reflects that some MTR platforms used half-height doors and that baseline conditions differed.

Metrics

1
Railway suicides after PSD installationpre-PSD period-59.9%% change

Lessons learned

  • Reductions occurred without displacement to unsealed platforms, supporting means restriction over substitution for this method.
  • Effect size varies with barrier height and baseline conditions — full-height doors and system-wide coverage are likely needed to maximise impact.